New water meter installations require payment in advance for the following:

 Water Permit - Residential  $100.00
 Water Permit - Commercial  $135.00
 Administration Charge  $25.00

Connection Fees:

 Meter Size      Water Meter Connection Fee
 3/4" and smaller  $400.00
 1"  $440.00
 1 1l2"  $1,445.00  (call for fire line fee)
 2"  $1,635.00  (call for fire line fee)

Connection fee for a water meter installed by a contractor is $245.00

Water Hydrant Meters are subject to a Water Permit Charge of $50.00, an Administration Charge of $25.00, and a $1,000 deposit.  Hydrant meters are billed bi-monthly at a rate of $62.90, plus $2.20 per ccf over 1,000 cf.  (Hydrant Meter Application)