Click to Home
Go To Search
RSSPrintEmail
Connect with DuPont
FacebookTwitter
Water Meter Fees

New Water Meter Installations:
 
New water meter installations require payment in advance for the following:


Water Permit Residential $100.00
Water Permit Commercial $135.00
Administration Charge $25.00
 

Effective 1/1/2011:


Connection Fees:


Meter Size Water Meter Connection Fee
3/4" and smaller $400.00
1" $440.00
1-1/2" $1445.00 (call for fire line fee)
2" $1,635.00 (call for fire line fee)


Connection fee for a water meter installed by a contractor is $245.00.                          

___________________________________________________

 

Water Hydrant Meters are subject to a Water Permit Charge of $50.00, an Administration Charge of $25.00, and a $1,000.00 deposit. Effective January 1, 2013, hydrant meters are billed bi-monthly at a rate of $55.70, plus $1.95 per ccf over 1,000 cf.  (Hydrant Application)